PetroRio will drill wells in Campo de Frade

PetroRio presented a development plan for campo de Frade, which was approved by the National Agency of Petroleum, Natural Gas and Biofuels (ANP).The statement was sent to the market last Thursday (24).

PetroRio's plan foresees the drilling of four producing wells and three horizontal injection wells in campo de Frade. The first phase of the revitalization plan will include drilling a producing well and two injector wells, expected to start between the fourth quarter and the first quarter of 2022.

The ANP also authorized the immediate resumption of water injection in two existing injector wells until the start of operation of the new injector wells.

ACESSE AS REDES DA PANORAMA OFFSHORE:

4 thoughts on “PetroRio will drill wells in Campo de Frade

Leave a Reply